claudeindex
Plugin

work-breakdown-structure

WBS from scope + deliverables. Enforces 100% rule, mutually exclusive siblings, deliverable-oriented nodes, 8/80-hour sizing, depth-by-need (3–5 levels). Decomposition axes (deliverable / phase / responsibility / hybrid) consistent within branches. WBS dictionary per node (description, deliverable, acceptance, size, deps, risks). Milestones distinct from work. Intra-WBS dependencies + coverage matrix. Anti-patterns flagged.

Installation

1

Add the marketplace

/plugin marketplace add SSiertsema/claude-code-plugins
2

Install plugins

/plugin

Run these commands in Claude Code to add this plugin to your environment. The marketplace must be added before you can install its plugins.